08-2013

Number 8 / 2013

To download all number in format PDF The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe

Number maintenance (pdf) (doc)

Number abstract (doc)

Literature lists to articles (doc)


 

№8|2013

anniversary

bbk 000000

UDC

Shuvalov M. V., Strelkov A. K., Atanov N. A.

80th Anniversary of Water Supply and Wastewater Management Department of the State Architectural and Constructional University of Samara


 

№8|2013

POTABLE WATER SUPPLY

bbk 000000

UDC 628.147.22

Strelkov A. K., Tsabilev O. V., Vasiliev V. V., Solodyannikova Yu. V.

Evaluation of the expediency of utility drinking water stabilization

Summary

Statistic, experimental and design data on the parameters influencing Samara tap water corrosiveness in relation to metallic materials of the pipelines are presented. The possibility of using pH correction and dissolved oxygen elimination methods for stabilization and water corrosiveness reduction is shown. The parameters of a pilot plant operation for catalytic deoxygenation are given.

Key words

, , , ,

 

№8|2013

WATER DISTRIBUTION NETWORKS

bbk 696.115.005

UDC

Zotova I. Yu., Zotov Yu. N., Strelkov A. K.

Methodic procedures of hydraulic designing plumbing systems in tenement buildings

Summary

Changes in the current water and wastewater regulatory legislation establishing unambiguous requirements to the development of methodic procedures are considered. The guidelines on creating methodic procedures that being implemented will ensure the legitimacy of the methods are given. It is shown that using utility facilities of the entire apartment as a primary element and introducing two new concepts, i. e. master service connection and maximum momentary flow, allowed developing advanced methods of determining design flows and required water head for the master service connection.

Key words

, , ,

 

№8|2013

WATER DISTRIBUTION NETWORKS

bbk 000000

UDC 628.12:62-523

Shmigol V. V., Chernosvitov M. D., Atanov N. A.

Integral control of pressure holding pump operation

Summary

The substantiation of the efficiency of the integral control of pressure holding pump operation in domestic water supply systems on the basis of the theoretic calculations, results of field studies of booster stations (water flow rate, pressure in suction and pressure pipelines) and pressure surveys in plumbing fixtures is presented. The diagrams of «pump-water main» working point movement at different control methods are given. The resource and power conservation efficiency of the integral control of pressure holding pump operation is determined. The recommendations on introducing integral control at block pumping stations are given.

Key words

, , ,

 

№8|2013

WATER DISTRIBUTION NETWORK RELIABILITY

bbk 000000

UDC 628.144.62-192

GALPERIN E. M., Shapkin N. V.

Methods ofimproving the reliability of water distribution network operation

Summary

The conditions of providing for the integrity of the water distribution network for maximum possible period are considered. On basis of analyzing the mathematical expression developed with the use of mass service system device the conditions of ensuring water distribution network integrity are determined. It is established from the experience of water distribution network operation that pipe material and repair time are critical for reliability improvement. Ductile iron pipes with interior cement-sand coating and PVC pipes as better meet this requirement.

Key words

, , , , ,

 

№8|2013

WASTEWATER TREATMENT

bbk 000000

UDC 628.3:665.5

Stepanov S. V., Strelkov A. K., Stashok Yu. E., Doubman I. S., Belyakov A. V.

The experience of designing oil refinery wastewater treatment facilities

Summary

The experience of developing design and working documentation of the new construction and reconstruction of wastewater treatment facilities for four oil refineries is presented. A structural scheme of biological wastewater treatment with nitrification-denitrification on the basis of a membrane bioreactor is suggested. Design solutions of regulating air supply to the aeration tanks that allow improving power efficiency are considered.

Key words

, , , , ,

 

№8|2013

WASTEWATER TREATMENT

bbk 000000

UDC 628.353.001.2

Shuvalov M. V., Strelkov A. K., Shouvalov R. M.

Biological wastewater treatment in disk biofilters

Summary

The analysis of the results of investigating geometrical, physical, chemical and biological parameters of biofilm in disk biofilters alongside with domestic wastewater treatment efficiency with the use of disk biofilters at the existing wastewater treatment facilities is presented. The data on the disk biofilter process conditions are required for calculating this type of equipment when designing wastewater treatment facilities.

Key words

, , , , , , ,

 

№8|2013

WASTEWATER TREATMENT

bbk 000000

UDC 628.35:62-278

Stepanov S. V., Stepanov A. S., Stashok Yu. E., Blinkova L. A.

Modular membrane bioreactors

Summary

The advantages of membrane bioreactors over traditional wastewater biological treatment facilities are shown; the perspective areas of their use are presented. The basic principles of designing membrane bioreactors are given. The engineering designs and specific features of low capacity membrane bioreactors with submerged hollow fiber membranes are considered.

Key words

, , ,

 

№8|2013

WASTEWATER TREATMENT

bbk 000000

UDC 628.312.2:556.164

Palagin Evgenii, Gridneva M. A., Bykova P. G., Nabok T. Yu.

Regularity of surface runoff composition changes

Summary

The summarized data on the surface runoff composition of the Samara territory are presented alongside with the results of investigating basic factors that determine the composition. The regularity of the surface runoff quality changes is analyzed. The representative set of parameters that provide for detecting the condition of the entire system and monitoring the composition of the runoff was specified. On the basis of time series decomposition the impact of separate components on the general variability of the surface runoff quality parameters was evaluated.

Key words

, , , ,

 
<< Start < Prev 1 2 Next > End >>
Page 1 of 2

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1