№4|2014
DRINKING WATER SUPPLY
bbk 000000
UDC 628.16.06
Investigating the processes of wash water treatment of pumping-filtration plant No. 5 of Novosibirsk
Summary
Research activities on processing wash water and water sludge from pumping-filtration plant No. 5 of Novosibirsk carried out during 2005–2009 provided for exploring sludge separation from wash water; modes and amounts of wastewater and wash water from the treatment facilities. For taking the final decision on the structure of the facilities and their number, dimensions and operating modes of every unit additional studies of wash water treatment processes were carried out in 2013. The main results obtained in the process of model studies in a specially designed and constructed plant (mixing chamber, flocculation chamber, horizontal sedimentation tank, rapid filter) are presented. The task of the dynamic tests was determining the limit wash water loading on a section of the horizontal settler in order to provide for the drinking water quality after treatment. During the tests optimal dosages and chemical feed points were specified; the impact of wash water temperature on the treatment level was determined. After sedimentation wash water passed treatment in the model rapid filter to the quality that meets the requirements of SanPin (Sanitary Regulations and Norms). The results of modeling allowed confirming the sufficiency of the process horizontal sedimentation tank dimensions for adequate wash water treatment. The recommendations on designing the composition of the facilities for sedimentation and filtration of wash water from pumping-filtration plant No. 5.
Key words
turbidity , rapid filter , wash water , water temperature , model plant , sedimentation facilities
The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe