№04|2015
SURFACE RUNOFF TREATMENT
bbk 000000
UDC 628.17.001.4
Protection of the Imeretinskaia Lowland from surface runoff flooding
Summary
Short information on the engineering-construction solutions of removing surface runoff from a development area on the Imeretinskaia Lowland territory of the Krasnodar Area is presented. Its surface is slightly elevated above the sea level (from 0.7 to 4 m); therefore, pressure removal of 100% storm runoff which at times becomes a disaster (during heavy rains) and causes significant damage to the territory is required. Removing surface runoff from residential areas of the Olympic park also requires advanced treatment. Taking into account the construction conditions the entire territory has been divided into five drainage areas to reduce the depth of the collection network and engineering structures. In each area a complex including a pumping station, an accumulating tank and advanced treatment facilities has been designed and built. The surface area of the drainage sites significantly differs from each other (30–440 ha). Following the extended survey and substantiation of the pumping equipment choice angular flow pumps with capacities 5 and 12.1 m3/h and 12.5 m head were selected. Taking into account the partial removal of pollutants in the accumulating tank two-stage filtration was used for advanced surface runoff treatment. Wastewater is treated with «Aqua-Aurat™18») coagulant and processed in the filters of the first stage with quartz sand media. To provide for the complete removal of residual dissolved oil products wastewater is supplied to the rapid gravity sorption filters of the second stage with MIU-S2 activated carbon media. The accumulating tank is cleaned from sludge regularly 2–3 times a year using a bucket loader. Sludge generated in the process of chemical wastewater treatment is dewatered in a belt filterpress. Dewatered sludge is disposed to the solid waste landfill.
Key words
treatment facilities , surface runoff , drainage area , rainfall intensity , pumping station , angular flow pump
The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe
REFERENCES
- Kats D. M., Shestakov V. M. Meliorativnaia gidrogeologiia [Meliorative hydrogeology. Moscow, MGU Publ., 1992, 256 p.].
- Rekomendatsii po raschetu sistem sbora, otvedeniia i ochistki poverkhnostnogo stoka s selitebnykh territorii, ploshchadok predpriiatii i opredeleniiu uslovii vypuska ego v vodnye ob”ekty [Recommendations for designing the systems of surface runoff collection, removal and treatment from residential areas, industrial sites, and determining the conditions of its discharge into water bodies. Moscow, «NII VODGEO» OJSC, 2014, 88 p.].
- Alekseev M. I., Kurganov A. B. Organizatsiia otvedeniia poverkhnostnogo (dozhdevogo i talogo) stoka s urbanizirovannykh territorii [Urban surface runoff (storm water and snowmelt runoff) management. Moscow, ASB Publ.; St. Petersburg, SPbGASU, 2000, 352 p.].
- Berezin S. E. Nasosnye stantsii s pogruzhnymi nasosami. Raschet i konstruirovanie [Pumping stations with submerged pumps. Calculation and design. Moscow, Stroiizdat Publ., 2008, 144 p.].
- Berezin S. E., Mironchik G. M. [Building Code 32.13330.2012 «Wastewater system. Public utilities»: comments to chapter «Pumping stations and air blower houses»]. Vodosnabzhenie i Sanitarnaia Tekhnika, 2012, no. 6, pp. 57–62. (In Russian).