Meshengisser Yu. M., Serba E. V., Raiber B. I., Glinskii I. A.

Introduction of integrated project management system (engineering, construction, equipment supply, commissioning)

Summary

The concept of project management acknowledged by «My Project» JSC is considered. The adopted project management structures are described alongside with the achievements within the frames of the presented introduction. For the implementation of «turn-key» projects the Company is using the matrix management system as well as such tools as MS Project, electronic document management system. The introduced matrix structure of project management presents a combination of two types of separation: by functions and by project. The main advantages of introducing the matrix management system into the structure of «My Project» engineering company are shown. Owing to the system of project management the experts of the Company can implement simultaneously several «turn-key» projects with guaranteed results with financial responsibility.

Key words

, ,

 

№10|2015

EQUIPMENT SERVICE AND MAINTENANCE

bbk 000000

UDC 628.2:658.562.5

Advanced Well-Timed Service

Summary

The organizational and financial problems that the directors and operating personnel of water and wastewater utilities have to face are presented. The new solutions of the service maintenance of the equipment that meet the current regulatory requirements are suggested. A brand new service type is suggested – Advanced Well-Timed Service (AWTS) that is represented by a number of package offers so-called service-plans: «Precap maintenance», «Individual», «All Included». AWTS is aiming at the optimization of the expenditures of the utilities and operating companies, reduction of labor input for process equipment maintenance, its life extension and improvement of the working conditions of the operating personnel.

Key words

, , , , ,

 
<< Start < Prev 1 2 Next >> End >
Page 2 of 2

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1