bbk 000000
UDC 628.11.004.69
TESLA V. G.
Reconstruction of Water Wells in Countryside
Summary
Measures concerning the reconstruction of standing idle and operating wells of agricultural water supply are considered. These measures include the restoration of wells capacity using the reagent methods, redistribution of a water inflow to a filter for spare intervals with the help of special devices, liquidation of sanding up installing the additional polyvinyl chloride edge filter. Recommendations are oriented, in the first place, to wells capturing friable, water containing deposits.
Key words:
reconstruction , filter , ground water , water well , restoration of capacity , sanding up , yield