№03|2023

DESIGNING WATER AND WASTEWATER SYSTEMS

UDC 621.644.07:519.863:006.053
DOI 10.35776/VST.2023.03.05

Shlafman Vitalii

The time factor in a technical and economic calculation task

Summary

Developing quantitative estimates of technical solutions assumes the calculation of economic indicators of the considered solutions. The properties of engineering and economic comparison models with account of the time factor are considered. The key aspects and properties of engineering and economic comparison models of the options are presented; the analysis of the content of the discounted cost indicator was carried out; its main properties were highlighted. The conditions for bringing options to a comparable form, identical material result and targeted economic efficiency are considered. The graphical material interpreting the discounted cost indicator is given. A simple interpretation of the discount rate is proposed. Its effect on the result of solving the problem of engineering and economic comparison of the options is shown. The ratio of the discounted cost indicator to the indicator of the duration of the life cycle of objects is considered. A method for interpreting the discounted cost indicator in practical calculations is proposed. It is shown that the knowledge of the general principles compensates for the ignorance of certain facts.

Ключевые слова

, , , , ,

For citation: Shlafman V. V. The time factor in a technical and economic calculation task. Vodosnabzhenie i Sanitarnaia Tekhnika, 2023, no. 3, pp. 38–44. DOI: 10.35776/VST.2023.03.05. (In Russian).

The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe

REFERENCES

  1. Shlafman V. V. [History of development and applied aspects of the issues of the optimal synthesis of pipeline systems]. Vodosnabzhenie i Sanitarnaia Tekhnika, 2022, no. 11, pp. 4–15. DOI: 10.35776/VST.2022.11.01. (In Russian).
  2. Daskovskii V. B., Kiselev V. B. [Estimation of the investment efficiency in the Soviet and market economy]. Investitsii v Rossii, 2014, no. 6, pp. 3–15. (In Russian).
  3. Sirotkin S. A., Kel’chevskaia N. R. [Overhead costs: is there any future?]. Vestnik Ural’skogo Gosudarstvennogo Tekhnicheskogo Universiteta, 2008, no 3, pp. 12–18. (In Russian).
  4. Novozhilov V. V. Problemy izmereniia zatrat i resul’tatov pri optimal’nom planirovann [Challenges in measuring costs and benefits in optimal planning. Moscow, Nauka Publ., 1972, 434 p.].

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1