№4|2019
POWER RESOURCES CONSERVATION
bbk 000000
UDC 628.14:62-531.3
Improving the operation of the Novosibirsk water supply system
Summary
In Novosibirsk over the past 20 years a set of measures has been implemented using equipment and technologies that have significantly improved the reliability and efficiency of the water supply system. Networks and facilities of the water supply system designed and built in the 1960–1980-ies have a large reserve for upgrade that will allow significantly improving their efficiency, reducing operating costs and improving the quality of water supply. As a result of the measures taken the company not only provides for the high-level water supply in the context of limited financial resources but also ensures the development of the city.
Key words
water supply system , energy efficiency , frequency converter , pressure reducing valve , most remote point , water consumption monitoring
The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe