№7|2012
WASTEWATER TREATMENT
bbk 000000
UDC 628.32.004.69
Developing a project of the Khabarovsk city wastewater system reconstruction
Summary
The main aspects of the Khabarovsk wastewater system reconstruction project are highlighted. The project includes the following tasks: reconstruction of the Main pumping station on the supply and pressure sewers; improvement of the wastewater treatment capacity; construction of sludge composting facilities; upgrade of the digesters and biogas utilization at a power mini-plant; sludge landfill engineering; development of tertiary treatment, disinfection and oxygenation facilities; off-site utilities engineering – gas, fiber optic line, cold water supply, power lines; gas facilities engineering in the treatment facilities area.
Key words
wastewater treatment , sludge , pumping station , biogenic elements , wastewater system reconstruction
The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe