Tag:house drainage system

№7|2018

SEWERAGE NETWORKS

bbk 000000

UDC 696.1

Stepanov Mikhail, Zakharov Iu. S.

Rehabilitation of house drainage systems with the use
of BRAWOLINER® flexible polymer liners

Summary

Replacement of house drainage systems in apartment buildings with the use traditional technologies encounters active opposition of the residents and is often eliminated. The reason lies in the necessary subsequent renovation of apartments at the owner’s cost. The use of flexible polymer liners provides for rehabilitating house drainage systems with minimum demolition works and high quality within a very short time. This requires beside the availability of process equipment and qualified personnel also shrewd planning and high-quality organizational and preparatory works with account of the specific features of each project. The factors influencing planning and cost of the works are as follows: number of apartments; number of storeys in the building; number of stand-pipes; number of offsets and abuttings; length of the drainage system (stand-pipes, abutting pipes); scope of performing works; labour costs; distance to the object; extra work to provide for the access to the pipeline; scope of plumbing work (if required).

Key words

, , , ,

 

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1