DOI 10.35776/VST.2022.03.03
UDC 628.168
Raff P. A., Fliagin Aleksandr
Optimization of the operation of the Penza water treatment facilities
Summary
With the purpose of providing for high quality drinking water at the Penza water treatment facilities, timely measures were taken to remove odor in the midst of plankton growth in the water source. Advanced flocculants were chosen for the processes of water and wash water treatment at the filtration facilities. Reducing the cost of chemical water treatment was achieved. The results of in-process testing of sorption purification of natural water carried out during the period of intensive plankton growth showed possible odor reduction by 1 point and feasible zeolite use during the initial and active periods of odor appearance in the water source.
Key words
potable water , water bloom , zeolites , plankton , optimization of the chemical consumption