bbk 000000
UDC 628.35
Iavtushenko Marina, Tarasova O. V., Rouzayev V. I., Belyaeva S. D., Bibyaev A. V., Belyaev M. A.
Commissioning the upgraded biological treatment plant at the Podolsk wastewater treatment facilities
Summary
The results of commissioning the upgraded biological treatment plant at the Podolsk wastewater treatment facilities are presented. The start up of the basic equipment, mixers and recycle pumps installed in anaerobic and anoxic zones; the secondary settler equipment; the new Korean NEUROS NХ-300 air blowers was carried out. The tertiary treatment unit washing regime during commissioning was defined. Commissioning of the UV-disinfection plant was carried out. The operational parameters of the treatment facilities were monitored by the automatic analyzers and sensors data; the laboratory control was carried out as well. Exceeding the incoming wastewater flow compared to the design value was noted; exceeding suspended solids and phosphate concentrations in the incoming wastewater was registered. However, despite the excess of the incoming wastewater flow and increased concentration of pollutants, the treatment facilities ensure advanced elimination of organic matter and nutrients.
Key words
disinfection , reconstruction , wastewater , dephosphatization , aftertreatment , biological treatment plant , nitri-denitrification , in-process control , active sludge dosage , dissolved oxygen