№4|2018

PRACTICAL NOTES

bbk 000000

UDC 628.112.24:622.245.71

Opryshko B. A., Shvetsov V. A., Liakh A. P., Belavina O. A.

A new design of an observation blowing well head

Summary

A new design of a blowing well head of underground water deposits is proposed. It is demonstrated that retrofitting the well head provides for the elimination of underground water spills from emergency wells; prevention of bog soils genesis, soil degradation and desertification on vast areas. The use of the well head ensures continuous hydrogeologic monitoring with the use of submersible stand-off sensors and recorders in blowing wells in different climate conditions on unguarded territories.

Key words

, , , ,

The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe

REFERENCES

  1. Lebedev A. V., Semenov S. M., Chalidze Iu. B. Organizatsiia i proizvodstvo nabliudenii za rezhimom urovnia, napora i debita podzemnykh vod (metodicheskie rekomendatsii) [Arrangement and performance of observations over the level mode, pressure and underground water yield (recommended practice). Moscow, MinGeo SSSR Publ., 1985, 42 p.].
  2. Opryshko B. A., Shvetsov V. A., Belavina O. A. [Pat. 133189, RF. U1 MPC Е21В 33/068. Observation blowing well head]. Izobreteniia. Poleznye Modeli, 2013, no. 28. (In Russian).
  3. Opryshko B. A., Shvetsov V. A., Petrenko O. E., Belavina O. A., Korostylev D. V. [Pat. 145347, RF. U1 MPC Е21В 33/03. Observation blowing well head]. Izobreteniia. Poleznye Modeli, 2014, no. 26. (In Russian).
  4. Opryshko B. A., Shvetsov V. A., Liakh A. P., Opryshko A. B., Belavina O. A. [Pat. 164052, RF. U1 MPC Е21В 33/068. Observation blowing well head]. Izobreteniia. Poleznye Modeli, 2016, no. 23. (In Russian).

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1