Tag:pipelines capacity

№2|2011

WATER SUPPLY

bbk 000000

UDC 628.142.001.24

Belyaev N. N., Sukacheva I. N., Radetskii Mikhail

Practice of Сarrying out Hydraulic Calculations on the Example of Water Supply System of the Right-Bank Part of Novosibirsk

Summary

One of the most important problems confronting the heads of water supply-sewerage services enterprises, – the reduction of energy and operating expenses for operation of water supply and water distribution systems, – is considered. Economic reasonability of a multiple-choice hydraulic calculation of the water supply network of the right-bank part of Novosibirsk is shown. As a result of the technological studies and a series of hydraulic calculations, the most rational (in the event of an increase in the volume of water consumption in the future) scheme of development of the water supply network of the city has been developed. In a complex with hydraulic calculations of the water supply and distribution system of the right-bank part of Novosibirsk a check calculation of the sufficiency of pure water tanks capacity has been carried out and the quality of water supplied to the consumer for revealing the corrosive-aggressive properties has been analyzed.

Key words

, , ,

 

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1