Tag:engineering work

№8|2020

ECOPOLYMER — MY PROJECT: ANNIVERSARY
OF THE GROUP OF COMPANIES

DOI 000000

UDC 628.1/.3:66.013.5

Meshengisser Yu. M.

30 years of growth and development

Summary

The analysis of engineering works in the field of water supply and sanitation indicates that the market demands are much higher than the supply. The time it takes to establish a qualified engineering company is 7–10 years. As experience shows there should be continuity in engineering; it requires personnel of various qualifications who can work in one team. The period 2015–2020 is characterized by significant growth of both the Ecopolymer Group of companies and, first of all, MY PROJECT engineering company. MY PROJECT simultaneously implements 16–18 large-scale integrated projects with up to 20 packages each. All stages of design work are supervised by a project engineering manager (PEM). A great deal of experience has been accumulated in undergoing the environmental and technical expertise of projects for the reconstruction of large-scale treatment facilities with a capacity of more than 50 thousand m3/day.
In the last two years alone, 15 positive expert opinions have been received. The products of Ecopolymer Manufacturing Enterprise (Kaluga Region) are not only highly competitive in efficiency and quality with imported counterparts, but in a number of types of equipment are superior to them - the import phaseout program is in full play. The products of «Ecopolymer» ME are recommended by the RF Ministry of Construction for the introduction at the enterprises of housing and utilities infrastructure of the Russian Federation suggesting the reliability and quality of the equipment.

Key words

, , , ,

 

 

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1