№8|2021

ADVANCED TECHNOLOGIES AND EQUIPMENT

DOI 10.35776/VST.2021.08.03
UDC 628.1/.3:697.911

Zoubov M. G., Obukhov Dmitrii, Diachuk Sergei

Engineering examination as the basis for the successful reconstruction of natural and waste water treatment facilities

Summary

During the operation of natural and waste water treatment facilities, conditions may change in relation to those accepted in design decisions. As a result, the treatment facilities cease to perform the functions assigned to them. Before the reconstruction of such water treatment and wastewater treatment facilities, engineering and technical examination is the basis for making the right technical and technological decisions. The examination involves a decision-making algorithm aimed at achieving the goals set while designing.Through the example of one of the food industry enterprises, the authors considered the positive impact of an extended engineering examination for the acception of correct technical and technological solutions that provide the proper quality of wastewater treatment with optimal capital investments.

Key words

, , , , , , ,

The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe

Журнал ВСТ включен в новый перечень ВАК

Шлафман В. В. Проектирование под заданную ценность, или достижимая эффективность технических решений – что это?

Banner Kofman 1